House Extension in Wood Green, London

Project Overview

Our client sought to expand her living space with a contemporary and efficient extension. The project aimed to create a seamless addition to her property, providing both increased area and modern amenities, while adhering to stringent building regulations and performance standards.

USE:
Home Extension
size:
3.39m x 3.1m
TyPE:
Home Extension
PROJECT VALUE:
Not disclosed
DURATION:
60 days
location:
Wood Green, London

HOW WE DID IT

The extension project in Wood Green, London, involved the construction of a 10.5 square meter extension. A key challenge was ensuring that the new structure met rigorous thermal performance values akin to a traditional new build, necessitating the use of high-performance insulation and construction methods. The design incorporated a structurally graded steel frame and insulated panels for the walls, roof, and floor, ensuring both durability and energy efficiency.

Materials were carefully selected for both aesthetics and performance. The external cladding utilised a thin-coat silicon render in white, complemented by bespoke pressed steel facias, corner profiles, and glazing abutments with a polyester coated finish. A single-ply EPDM flat roof membrane was chosen for its durability and fire rating. Internally, 12mm plasterboard was used for walls and ceilings, ready for the client's final decoration.

Star icon

Contemporary extension

Star icon

EPDM flat roof membrane

Star icon

Ground Screw Foundations

  • High Thermal Performance: Achieves U-values of 0.13 for floor and roof, and 0.18 for walls, meeting new build standards.
  • Robust Structure: Features a 6mm gauge, zinc phosphate coated, structurally graded steel frame.
  • Modern Glazing: Includes two 2m aluminium doors and one 2m x 1m roof lantern, with anthracite grey exterior and white interior finishes.
  • Integrated Electrical System: Full first and second fix electrical installation, including internal downlights, external wall lights, and an external power socket.
  • Efficient Rainwater Management: Equipped with 100mm half-round aluminium guttering and downpipes.
  • Ground Screw Foundations: Utilizes galvanised steel ground screws, each with a 1.3 KN load capacity, for stable and efficient foundation installation.

Watch the video testimonial with the client:

benefits

Our modular buildings are designed, engineered and built to perfection

10 Year Warranty

We’re so confident in the longevity and performance of our structural steel frame modular buildings that we offer an industry-leading 10 year guarantee as standard.

Lead time

We are proud to offer an industry-leading guaranteed 6 week lead time from the date of order.

Bespoke

Our distinctive range of exterior cladding finishes and architectural embellishments is quite simply unparalleled. There are no limits to the space we can create for you.

One Price; No Hidden Extras

Our price includes everything from delivery, installation, foundations, doors & windows, painted walls, electrics, lighting and flooring, to name just a few.

Built to UK Building Regulations

Our modular buildings comply with all aspects of current UK building regulations, so you not only have complete peace of mind that your extension is built to last but you also have a space that can be comfortably used all year round.

Designed & Built in the UK

We use the most advanced modular construction technology to precision craft every modular building at our Warwickshire production facility.

How our Design & Build Process Works

Step 1
ENQUIRY
Complete our customer enquiry form so we can fully understand your modular building requirements, and one of our dedicated team members will contact you to arrange a design consultation. Please contact us to arrange a visit to our Garden Room showroom in Coventry.
Step 2
PROPOSAL
We will send over a proposal that includes our terms and conditions, technical drawings, agreed payment plan details, and offer you a fixed installation date commitment for your modular building.
Step 3
SITE SURVEY
One of our expert project managers will take a few measurements at a pre-arranged site survey and make all considerations to ensure the installation process will go as smoothly as possible.
Step 4
MANUFACTURE
Our team will begin the manufacturing process at our Warwickshire production facility to precision craft your modular building and book in our installation team for the agreed installation date.
Step 5
INSTALLATION
We will contact you around a week before the agreed installation date to confirm any final arrangements that need to be made. Our install team will arrive on the morning of your install date and complete all works within the agreed timeframe. Our standard garden rooms are typically installed within 5-7 working days for example.
GET A QUOTE
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Close

Did you find what you were looking for?

We want to make sure you have all the information you need about Vita Modular.

If you didn't find what you were after, or if you have any questions, please don't hesitate to get in touch.

Contact Options: